Tutorial
12 min read

Save named snapshots, compare two versions side-by-side with delta highlighting, and safely restore a past state — with an automatic safety snapshot created before every restore.

Protecting Your Budget with Version History

In this tutorial you will save a named snapshot of a budget, browse your version history, compare two versions side-by-side, and safely restore a past state. By the end you will know how to use version history as a safety net any time you make significant changes to an event budget.

What you will accomplish:

  • Save a named version of a budget before making changes
  • Browse your version history and view snapshot details
  • Compare two versions to see exactly what changed
  • Restore a previous version with a full safety snapshot automatically created for you
  • Understand how auto-save and Ctrl+Z protect your work without any manual action

What you need before you start:

  • An active Event Revenue Pro account on the Starter plan or above
  • At least one existing budget with a few categories and line items already built out

Free plan note: Manual version saves and version comparison require the Starter plan or above. The auto-save undo stack (Ctrl+Z) is available on all plans at no extra cost.

This tutorial takes about 12 minutes to complete.


Step 1 — Save a Named Version

Before making any major change to a budget — adding a new service category, renegotiating vendor rates, or restructuring the event day breakdown — save a version first. Think of it as a named checkpoint you can return to at any time.

  1. Open any budget from the Budgets list.

  2. In the top-right corner of the budget page, click the More menu (the three-dot ⋯ icon).

  3. Click Save Version.

  4. In the dialog that appears, fill in the fields:

    FieldWhat to enter
    LabelA short, meaningful name for this snapshot — e.g., Before venue negotiation or Client approved v2
    Notes (optional)Any context you want to remember — e.g., Rates as quoted by caterer on 3/15
  5. Click Save Version. The dialog confirms the save and closes automatically.

You will notice the version badge next to the budget name updates — for example, from v3 to v4. This badge always reflects the most recently saved version number.

When to save a version: Save before restructuring categories, before presenting a budget to a client, after a client approves a proposal, and before any vendor rate negotiation that might change line item costs.


Step 2 — Browse Your Version History

Now that you have saved at least one version, open the version history to see the full timeline.

  1. Click the More menu (⋯) again.
  2. Click Version History.

The Version History drawer opens on the right side of the screen. Each row in the list shows:

  • The version number chip (e.g., v4)
  • The label you gave it
  • The date and time it was saved, and who saved it
  • Your optional notes, if any

Versions are listed newest-first so the most recent snapshot is always at the top.

View a snapshot summary

To inspect what a version contains without restoring it:

  1. Find the version you want to inspect.
  2. Click the View button on that row.

A dialog opens showing a read-only summary: the number of categories, the number of line items, and the total budget amount at the time of the snapshot. This is useful for quickly confirming you are looking at the right version before committing to a restore.

  1. Click Close to dismiss the dialog.

Step 3 — Compare Two Versions

When you want to understand the difference between two points in time — for example, to see what changed after a client revision — use the version comparison tool.

Requirement: You must have at least two saved versions to compare.

  1. In the Version History drawer, click Compare Versions (visible when two or more versions exist).
  2. The Compare Versions dialog opens. By default, it selects your two most recent versions — the Base (older) on the left and the Compare (newer) on the right.
  3. Use the two dropdowns at the top to choose any two versions you want to compare.
Understanding the Delta View

The Delta tab is open by default. It shows every line item grouped by category, with each item color-coded by what happened to it:

ColorMeaning
GreenItem was added in the Compare version
Red / strikethroughItem was removed compared to the Base version
OrangeItem changed — the old value is shown struck-through above the new value
Dimmed / no highlightItem is unchanged

At the top of the dialog, summary chips show the total count of additions, changes, and removals at a glance. The footer shows the revenue delta between the two versions.

Switching to Side-by-Side View
  1. Click the Side-by-Side tab.
  2. The dialog displays a two-column table: the Base version on the left, the Compare version on the right.
  3. Yellow-highlighted cells indicate values that differ between the two versions. Gray cells indicate an item exists on one side but not the other.

Tip: Side-by-side is useful for a precise line-by-line comparison. Delta view is better for a quick overview of what changed and by how much.

  1. Close the dialog when you are done reviewing.

Step 4 — Restore a Previous Version

If you need to roll back a budget to an earlier state — for example, to undo a batch of changes or return to a client-approved version — use Restore.

Important: Restoring a version replaces all current categories and line items with the contents of the snapshot. Before you proceed, read through this step so you understand exactly what happens.

  1. In the Version History drawer, find the version you want to restore.

  2. Click the Restore button on that row.

  3. A confirmation dialog appears:

    "This will overwrite all current line items with the state from version {number} — '{label}'. Are you sure?"

  4. Click Yes, Restore to proceed.

What happens during a restore

The restore process has four automatic steps you do not need to manage:

  1. Safety snapshot — Before anything is overwritten, Event Revenue Pro automatically saves your current budget state as a new version. It is labeled Pre-restore snapshot (before restoring v{number}). This means you can always undo a restore by restoring that auto-created version.
  2. Transactional replace — All existing categories and line items are removed and replaced with the exact data from the snapshot, including category order, line item order, quantities, costs, markup, and tax settings.
  3. Audit snapshot — After the restore is complete, another version is automatically saved, labeled Restored from v{number} — {label}. This creates a clear record of when the restore occurred and what was restored.
  4. UI refresh — The budget page reloads, showing the restored state. The version badge updates to reflect the new version number.

When the restore finishes, you will see a confirmation toast at the bottom of the screen: "Version restored successfully."

Nothing is permanently lost. Because a pre-restore snapshot is always created automatically, the state before the restore is always recoverable. You can restore the pre-restore snapshot at any time using the same workflow.


Step 5 — Using Auto-Save and Ctrl+Z

You do not need to be on a paid plan to benefit from version protection. Every time you make a change to a budget — adding a line item, updating a cost, deleting a category — Event Revenue Pro automatically saves a snapshot of the state just before that change.

These auto-saves are labeled with the action that triggered them, for example:

  • [Auto] Added line item: DJ Services
  • [Auto] Updated quantity: Photography
  • [Auto] Deleted category: Florals
Undoing with Ctrl+Z

To step back through your recent changes:

  1. Press Ctrl+Z (Windows) or Cmd+Z (Mac) while viewing a budget.
  2. The most recent auto-save is restored immediately.
  3. Press again to continue stepping back through earlier changes.

The undo stack holds up to 10 auto-saves per budget. When you reach the 10th, the oldest is removed to make room for new ones.

Viewing the undo stack in the drawer

Auto-saves also appear inside the Version History drawer alongside your manually saved versions. They are visually distinct — their labels always start with [Auto] — so they are easy to identify.


What you have learned

  • How to save a named snapshot of a budget before making changes
  • How to open Version History and inspect past snapshots
  • How to use Delta View and Side-by-Side View to understand what changed between any two versions
  • How to restore a version safely, knowing a pre-restore snapshot is always created automatically
  • How auto-save and Ctrl+Z protect every change, even without a manual save

What's next